No energy to blog...

11:27 PM Edit This 0 Comments »
But here is a brief recap and semi-pictorial of our first real "demo" day. We tore out Anna's room. Pulled off all the drywall. Found that when we pulled the drywall out of the closet ceilings that all 14 inches of blown, cellulose loose insulation in the attic fell onto the floor below. Found out that our new fridge (about 2 years old now) has been leaking from the ice maker line and we have water damage behind the wall and into the next room. Various bumps, bruises, cuts, and achy muscles and backs. All to be expected. All things considered - a pretty good day.

"Before" - the pink one is Anna's room (go figure) facing towards the front door (what you see there is her closet - the front door in on the far side of that wall), and the view of the hallway wall from the front door (Anna's room is (or was...) on the other side of the hallway wall).




"Semi-after" - Actually, it's all stacked in the middle of the room now. The hallway light switch in on the wall, at ceiling height, the thermostat in on a door jamb in the living room, and there are garbage bags stapled to the ceiling to keep more CRAPPY insulation from falling down into the air.


0 comments: